Author List: Xia, Weidong; Lee, Gwanhoo;
Journal of Management Information Systems, 2005, Volume 22, Issue 1, Page 45-83.
This paper conceptualizes and develops valid measurements of the key dimensions of information systems development project (ISDP) complexity. A conceptual framework is proposed to define four components of ISDP complexity: structural organizational complexity, structural IT complexity, dynamic organizational complexity, and dynamic IT complexity. Measures of ISDP complexity are generated based on literature review, field interviews, and focus group discussions. The measures are then refined through a systematic process and are tested using confirmatory data analyses with survey responses from 541 ISDP managers. Results support the final measurement model that consists of a second-order factor of ISDP complexity, four distinct first-order factors, and 15 measurement items. The measurement adequately satisfies the criteria for unidimensionality, convergent validity, discriminant validity, reliability, factorial invariance across different types of ISDPs, and nomo logical validity. Implications of the study results to research and practice as well as limitations of the study and directions for future research are discussed.
Keywords: conceptual framework; confirmatory factor analysis; information systems development project; scale development; scale validation
Algorithm:

List of Topics

#124 0.260 validity reliability measure constructs construct study research measures used scale development nomological scales instrument measurement researchers developed validation discriminant results
#263 0.175 instrument measurement factor analysis measuring measures dimensions validity based instruments construct measure conceptualization sample reliability development develop responses assess use
#292 0.167 information research literature systems framework review paper theoretical based potential future implications practice discussed current concept propositions findings provided extant
#224 0.115 complexity task environments e-business environment factors technology characteristics literature affect influence role important relationship model organizational contingent actual map dimension
#135 0.092 project projects development management isd results process team developed managers teams software stakeholders successful complex develop contingencies problems greater planning
#162 0.052 structural modeling scale equation implications economies large future framework perspective propose broad scope resulting identified leading analyzed second interviews analysis